Posted on February 6, 2026 at 12:18 PM by Alex Buffalow
Below freezing temperatures continued to present challenges at the Bristol Quarry Landfill this week. A stormwater pump froze preventing the normal removal of water from the system. A portable pump was installed, and 275-gallon totes were used to remove the water. Reserve leachate pumps were cleaned and rebuilt, and routine maintenance was conducted on the landfill gas system and well heads