Landfill Update for March 6, 2026.

Posted on March 9, 2026 at 11:51 AM by Rick Belcher

This week crews removed and replaced two leachate extraction pumps at the Bristol Quarry Landfill. Routine maintenance was performed on the landfill gas system, well heads, and flare. Additional soil was also spread to address areas affected by settlement issues. 

Feb 27

Landfill Update for February 27, 2026.

Posted on February 27, 2026 at 8:00 PM by Rick Belcher

Crews at the Bristol Quarry Landfill spread soil to address areas affected by settlement this week. Surface water was also removed with the stormwater pump, and routine maintenance was conducted on the landfill gas system and well heads. 

Feb 20

Landfill Update for February 20, 2026

Posted on February 20, 2026 at 4:59 PM by Gene Christian

Two leachate extraction pumps were removed and replaced at the Bristol Quarry Landfill this week. Routine maintenance was performed on other systems, and surface water was removed by the stormwater pump.