Posted on September 15, 2023 at 12:58 PM by Joey Lamie
This week work progressed on fine-tuning the Sidewall Odor Mitigation System (SOMS) and the expansion of the gas extraction system. Pumps are being installed in the low points of the SOMS system to pull out the condensation. Nine (9) new Blackhawk pumps were also installed in select vertical gas extraction wells to help extract condensate and leachate from the wells.
Additional air monitoring report summaries have been added to BristolVaLandfill.org and can be found at this link.